I have never actually timed it I just get into a sequence that give enough time to demold without being real soft. I use the sprue to tell me if it has been long enough. On this mold at least I will tip it to the side and if the sprue is not running out it is ready. But I still put them on a piece of scrap aluminium to cool. The reason I mentioned the bear mold is that mold gave me enough time to fill both, clean out the adapter, then the injectors, then cut the sprue from the last shot and return them to the small containers in the pictures. At that point enough time has passed to demold and start again. I dont have any wait time in the middle of pouring. Kind of a one man band thing. If I had to answer a tine question I would guess maybe a minute. Frank