robalo01 Posted June 1, 2019 Report Share Posted June 1, 2019 7.5 inch ribbon tail I have 1 12-cavity tail mold and 3 4-cavity Worm molds. 2 Presto pots with auto stirs 2 large injectors with plenty extra tips 1 person working alone with about 4-6 hours per session What is the most productive way to work? A)Heat one color, Shoot all the tails then separate, heat the other color and shoot all the bodies? Heat both colors and shoot a set of tails, place them in the worm molds, shoot the body and repeat? Thanks for your help Quote Link to comment Share on other sites More sharing options...
Bass-Boys Posted June 1, 2019 Report Share Posted June 1, 2019 I personally spend a few hours just shooting tails. Lots of tails .. Package them up and set aside to have ready for when I do the bodies. Sometimes its weeks or months before I use um. 1 Quote Link to comment Share on other sites More sharing options...
robalo01 Posted June 10, 2019 Author Report Share Posted June 10, 2019 bump Quote Link to comment Share on other sites More sharing options...